- Application portal or method
- Two-track and split by borough. In the 10 boroughs served by the film office you first contact the Bureau du cinéma et de la télévision de Montréal (BCTM) to open a production file and get a file number, then send the completed application form plus documents to film.tv@montreal.ca. The occupation permit itself is applied for on the city's online form (entretien-circulation.demandes.montreal.ca/tournage-audiovisuel). A separate application is required for every public place occupied: roadway (street, lane, sidewalk), park or public square, or municipal building.
- Boroughs coordinated by the BCTM (central film office)
- 10 of the 19 boroughs route through the BCTM: Ahuntsic-Cartierville, Côte-des-Neiges–Notre-Dame-de-Grâce, Mercier–Hochelaga-Maisonneuve, Le Plateau-Mont-Royal, Rivière-des-Prairies–Pointe-aux-Trembles, Rosemont–La Petite-Patrie, Saint-Laurent, Le Sud-Ouest, Ville-Marie, Villeray–Saint-Michel–Parc-Extension. The same 10-borough list is what the city's own permit page shows as the BCTM procedure.
- Boroughs that do NOT go through the BCTM
- 9 boroughs run their own film authorisation and publish their own procedure, fees and lead times: Anjou, Lachine, LaSalle, L'Île-Bizard–Sainte-Geneviève, Montréal-Nord, Outremont, Pierrefonds-Roxboro, Saint-Léonard and Verdun. Verdun says so explicitly. Outremont is a partial exception: rue Hutchison shoots go to the BCTM. This borough-level split is the single most common outsider mistake. There is no one Montréal film permit.
- Minimum lead time — BCTM boroughs
- 3 weeks recommended between opening the production file and the first day of shooting on public property. The BCTM notes processing times vary from May to October (high season) and advises submitting earlier.
- Processing time — online public-domain occupation permit
- 2 business days, as published on the Anjou variant of the city permit page (this is the processing time for the online occupation permit itself, not the film authorisation).
- Minimum lead time — Lachine and LaSalle
- 10 business days before the first shooting day. Lachine states it for the online occupation permit request; LaSalle states it for the borough filming authorisation, which is a separate step from the occupation permit.
- Minimum lead time — Outremont
- 14 business days. Outremont requires an in-person appointment with the completed form and documents at the Service de la sécurité publique, 999 avenue McEachran, bureau 101.
- BCTM file-analysis fee
- 38 $ per request analysed, from January 2026, regardless of the number of shooting days. Charged once the BCTM analyses a request, even if the shoot is cancelled. Does not apply to amateur shoots or shoots by a non-profit legal person.
- Occupation permit fees — standard city tariff (as published for Anjou)
- Taxes included. Permit issuance 30 $. Daily occupation charge on top: up to 99 m2 of a rear sidewalk, lane or unpaved surface 35 $/day; up to 49 m2 of street or sidewalk 40 $/day; 50–99 m2 of street or sidewalk 100 $/day; any surface over 100 m2 at 1,30 $ per m2. Lane-obstruction charge by width of local or arterial street obstructed: under 3 m (1 lane) 40 $/day; 3–6 m (2 lanes) 70 $/day; 6–9 m (3 lanes) 240 $/day; 9–12 m (4 lanes) 360 $/day. Permit valid for a maximum of one month; an extension means a new application.
- Occupation permit fees — Outremont (own tariff, much higher)
- Taxes included. Non-refundable analysis fee 227,14 $; permit issuance 126,88 $. Surface per day: up to 99 m2 of rear sidewalk/lane/unpaved 151,93 $; up to 49 m2 of street or sidewalk 92,29 $; 50–99 m2 183,44 $; 100–299 m2 at 3,38 $/m2; 300 m2 and over at 5,62 $/m2. Local street obstruction per day: 68,65 $ / 92,29 $ / 137,30 $ / 298,24 $ for 1 / 2 / 3 / 4 lanes. Arterial street obstruction per day: 92,29 $ / 298,24 $ / 596,46 $ / 918,33 $ for 1 / 2 / 3 / 4 lanes. Parking: 10,30 $/day for a space without a meter, 29,43 $/day per metered space, plus 3 $/hour lost meter revenue to a maximum of 12 h. Filming in a park, per hour: under 10 people 236 $; 10–30 people 352,50 $; over 30 people 586,25 $.
- Permit fees — Lachine, LaSalle, Saint-Léonard
- Lachine (taxes not included): permit issuance 150 $; borough park or public space 307 $/day; municipal building 520 $/day per location plus cost of works. LaSalle: filming authorisation 100 $/day; use of any part of a municipal building 750 $; other related costs possible, e.g. security services. Saint-Léonard (taxes included): filming fee 96 $/day.
- Permit fees — the 10 BCTM boroughs
- on request
- What activity requires a permit
- A temporary public-domain occupation permit is required to shoot in a public space, close a street, or occupy parking spaces. One application per public place occupied. A site layout sketch (croquis d'implantation) is required whenever the public domain is occupied (street, sidewalk, parking); a signage board / engineer-sealed plan is required for a street closure.
- Published exemptions
- Lachine: no charge for non-profit shoots, televised news bulletins and student shoots. BCTM: the 38 $ analysis fee does not apply to amateur shoots or non-profit legal persons. No city-wide exemption for small handheld crews on public property is published. See the not-published note below.
- Permit duration
- Maximum one month; to extend you must file a new application, and the permit can be reissued at most one additional time per year.
Montréal has no single film permit. A central film office (BCTM) coordinates 10 of 19 boroughs; the other 9 boroughs issue their own filming authorisation with their own forms, fees, lead times and in some cases their own consent rules. On top of whichever film authorisation applies, the physical occupation of the roadway is a separate city occupation permit filed through the online portal. Budget for two permits, not one, in Lachine/LaSalle-style boroughs.